January 25th, 2017: Site Grading and Clearance
Lowering the site elevation to the base of the grade beams in preparation for foundation concrete work. Pile cleaning to follow. Fill be kept over the footprint of the rear swimming pool in order (to the greatest degree possible) not interfere with grade beam formwork.